S24E1 - Sculpture Studio Extension - Floor
The Hometime crew uses pavers and retaining walls to capture space under a second-story deck.
Feb. 6, 2010, midnight
S24E2 - Sculpture Studio Extension - Walls
The Hometime crew frames and insulates curtain walls to enclose the space under a second-story deck.
Feb. 13, 2010, midnight
S24E3 - Sculpture Studio Extension - Wrap Up
The Hometime crew finishes the space under a second-story deck to expand a workshop used to create metal sculpture.
Feb. 20, 2010, midnight
S24E4 - Stone Cottage – Cul-De-Sac Prep
The Hometime crew works with surveyors, graders and architects to prepare a building site. Episode one of a thirty part series focusing on this well-designed, state-of-the-art home.
Feb. 27, 2010, midnight
S24E5 - Stone Cottage – Concrete & Foam
The Hometime crew works with a contractor to excavate for the new house and use poured-in-place insulating concrete forms for the basement walls.
March 6, 2010, midnight
S24E6 - Stone Cottage – Instant House
The Hometime crew helps out as the floors and walls of the house are pre-built in a nearby factory and then quickly assembled at the job site on top of the foundation.
March 13, 2010, midnight
S24E7 - Stone Cottage – Roofscape
The Hometime crew watches as the intricate roof framing components for the house are pre-built off-site, assembled on the ground, and finally hoisted into place.
March 20, 2010, midnight
S24E8 - Stone Cottage – Windows
The Hometime crew supervises the design, construction and installation of the windows for the home, and explains the natural slate roofing system.
March 27, 2010, midnight
S24E9 - Stone Cottage – Concrete Floors
The Hometime crew prepares for and supervises the installation of the basement, garage and porch floors.
April 3, 2010, midnight
S24E10 - Stone Cottage – Inner Workings
The Hometime crew manages the installation of the ductwork, recessed lighting, and central vacuum while also helping out with the driveway, stonework and siding.
April 10, 2010, midnight
S24E11 - Stone Cottage – Insulation
The Hometime crew installs cables for lighting control, audio, video and security and helps out with several types of insulation.
April 17, 2010, midnight
S24E12 - Stone Cottage – Geothermal
The Hometime crew helps out installing the radiant floor heating system and the geothermal heating and cooling equipment.
April 24, 2010, midnight
S24E13 - His and Her Garage
The Hometime crew wraps up a project with a second floor yoga studio for “her” and a garage-level workshop for "him."
Sept. 11, 2010, midnight
S24E14 - Stone Cottage -- Interior Walls
After some last-minute preparation crews install four different types of wall board for the interior walls and ceilings.
Sept. 18, 2010, midnight
S24E15 - Stone Cottage -- Vaulted Ceilings
The project house gets sheathing for the floors, extra-tough primer on the walls, and a stained-cedar vaulted ceiling in three high-profile rooms.
Sept. 25, 2010, midnight
S24E16 - Stone Cottage -- Millwork
Wooden beams are built outside for the porches. Inside, hardwood trim wainscoting is installed.
Oct. 2, 2010, midnight
S24E17 - Stone Cottage -- Exterior Doors
The Hometime crews scopes out how the custom matching garage and entry doors are made, and helps out leveling the floors for tiling.
Oct. 9, 2010, midnight
S24E18 - Stone Cottage -- Tile
The Hometime crew helps out as craftsmen install ceramic and natural stone tile in the bathrooms, natural stone on the fireplace, and natural stone for the retaining walls.
Oct. 16, 2010, midnight
S24E19 - Stone Cottage -- Driveway
The Hometime crew installs the paver driveway, as well as the master bathroom cabinets.
Oct. 23, 2010, midnight
S24E20 - Stone Cottage -- Interior Doors
The Hometime crew works on the interior doors, kitchen cabinets, wainscoting, and exterior columns.
Oct. 30, 2010, midnight
S24E21 - Stone Cottage -- Laundry Room
The Hometime crew installs custom cabinets for the laundry room and starts the home’s wood flooring.
Nov. 6, 2010, midnight
S24E22 - Stone Cottage -- Office
The home office begins to take shape, as the custom staircase work begins.
Nov. 13, 2010, midnight
S24E23 - Stone Cottage -- Countertops
The stone countertops are fabricated and installed.
Nov. 20, 2010, midnight
S24E24 - Stone Cottage -- Fixtures and Appliances
The Hometime crew installs cabinets, countertops and landscaping.
Nov. 27, 2010, midnight
S24E25 - Stone Cottage -- Retractable Screens
The covered porch gets motorized screens, the garage floor gets an epoxy coating, and the last few cabinets are installed.
Jan. 22, 2011, midnight
S24E26 - Stone Cottage -- Sod and Stone
The custom handrail is built, granite countertops are installed, the drip irrigation is wrapped up, and the yard gets sod.
Jan. 29, 2011, midnight